Gland Packing Vs Mechanical Seal?

 

Advertisement

Gland Packing vs Mechanical Seal?

Advertisement

Installation Time:

Advertisement

The Installation time for mechanical seal usually takes seven to eight hours (include flushing system). Normally the installation duration will depend on the size of the mechanical seal.

On the other hand, glad packing installation will take a maximum of one to two hours and it will depend upon the size of shaft and number of gland packing rings required.

Capital cost

Mechanical seal cost are very high.

Gland packing cost is very low compared to the mechanical seal.

Spare cost 

Mechanical seal Spares to be maintained. High spare cost. 

Gland packing Spare is not applicable.

Advertisement 

Skill requirement

Skilled manpower is required for mechanical seal installation, removal and assembly

Minimal training is sufficient for gland packing installation and removal 

Leakage rate

Mechanical seal Very minimal leakage 

Gland packing Leakage will be high

Product loss 

Mechanical seal Very minimal

Huge production loss when compare with mechanical seal 