In addition to the work outlined below, maintenance and word required for normal operations (CENTRIFUGAL PUMP/OPERATION/NORMAL OPERATION ) must also be carried out.
The following maintenance work is to be carried out at monthly intervals.
MONTHLY SCHEDULE MAINTENANCE:
1). Bearings:
- Check temperature
- Measure vibrations
- Oil level Grease level is to be checked
- Check for strange noises
2). Volute casing (upper part – lower part):
- Check for corrosion and wear
3). Shaft with bearing:
- Check for smooth running
4). Coupling:
- Check alignment
- Check pads for wear
5). Stuffing box seal Mechanical seal:
- Check for leaks
- Check for wear
6). Pipework:
- Check for leaks
7). Complete pump:
- Check for leaks
- Cleaning
Six month Schedule:
The following maintenance work is to be carried out at 6-monthly intervals
Complete pump:
- Check mounting of pump on the foundation
Motor:
- Check mounting of motor on the foundation
Annually maintenance schedule:
The following maintenance work is to be carried out at annual intervals.
Complete pump
- Complete service according to instructions form Andritz AG (Oil change Grease change, impeller check, etc.)